The enclosure was constructed with a double-wall system and acoustic insulation material to ensure maximum noise reduction. The ventilation and air extraction units were installed to ensure proper air circulation within the enclosure, while the fire-retardant materials used in the construction ensured the safety of personnel in case of a fire outbreak.
MNA Group’s turnkey approach ensured that the project was completed within the agreed timeline and budget, with minimal disruption to the client’s operations. The project was completed with full painting in colours specified by the client.
We were proud to deliver a solution that exceeded the expectations of our client as we always strive to deliver excellence in every project we undertake.